HUMAIN GB300 AI factory (phase 1)

The first phase of Saudi Arabia’s HUMAIN AI factories: 18,000 NVIDIA GB300 Grace Blackwell systems on InfiniBand, part of a 500 MW five-year plan.

HUMAIN GB300 AI factory (phase 1) is an announced GPU cluster run by HUMAIN (Public Investment Fund) in Saudi Arabia. 18,000 NVIDIA GB300 GPUs are planned; no installed count is published. Planned power: 500 MW.

GPU cloud

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
HUMAIN (Public Investment Fund) 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA GB300 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPUs planned Announced, contracted or target GPU count. Not evidence that the GPUs are installed.
18,000 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Saudi Arabia 1
Country Country of the cluster, taken from the location.
Saudi Arabia 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
Not published
Planned power MW Planned or contracted power at full build, in megawatts.
500 1
Power notes Basis and date of the power figures, and who published them.
Up to 500 MW across HUMAIN’s AI factories over five years (programme total, not phase 1). 1
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
announced 1
Status notes The source’s wording on status, with the date.
Announced 13 May 2025. 1
Partners Customer, facility owner, builder or procurement body, as named by the source.
NVIDIA 1
Interconnect Cluster network fabric.
NVIDIA InfiniBand 1

Sources

  1. NVIDIA: HUMAIN and NVIDIA partnership (May 2025) accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.