Methodology
First-party sources, one link per number, a date on every row.
What counts as a cluster
One row is one identified installation of GPUs: a named supercomputer, a named AI campus build, or a named customer deployment. Fleet totals (“24,000 H100s across six data centers”), platform scaling limits (“scales to 20,000 GPUs”) and custom-silicon machines (Trainium, TPU, Ascend, wafer-scale engines) are not clusters, and they stay out.
Where the data comes from
First-party pages come first: operator user documentation, engineering blogs, lab and supercomputing-centre pages, company investor materials and SEC filings. Trade press fills gaps and is named as press in the row. For a few campuses, live and planned power comes from Epoch AI’s AI data centers dataset, used under the Creative Commons Attribution 4.0 licence. Those numbers are satellite-based estimates: the record page says “Epoch AI estimate” next to them and the source title starts with the same words. We changed nothing in Epoch AI’s figures; we pick the as-of date and set company figures ahead of them wherever a company publishes one. Every record lists its sources with the date we accessed them, and every number in the table links to the source behind it.
How GPUs are counted
The installed count is physical GPUs. Where an operator publishes nodes and GPUs per node, the count is that product (Frontier: 9,856 nodes × 4 MI250X = 39,424). An AMD MI250X board counts once, not as two dies; an MI300A APU counts as one GPU; a GH200 superchip counts as one GPU. H100-equivalents, design limits and unaudited press totals never enter the installed column. Planned and contracted counts have their own column. When a source covers one partition or one building, the note says so.
Status: announced versus operational
Operational: the operator or a primary source says the cluster runs, or the operator’s current user documentation describes it in the present tense. Partly operational: a phase is live and more is coming. Under construction: building is underway and no phase is live. Announced: disclosed or contracted with no confirmed go-live. Where an operator gave a go-live target and later sources confirm nothing, the row stays announced and the status note carries the target and the date we last looked. “Operational since” is filled only when a source gives a month or year.
Power
Live power is megawatts of IT load in service; planned power is the full-build figure. Company figures and Epoch AI estimates are marked in each row’s power note. Apparent power in MVA and facility (rather than IT) megawatts are kept in the note, not the number.
Overlap with AI Data Center List
Our sister site AI Data Center List tracks the campus: megawatts, land and tenants. This list tracks the cluster: owner, GPU model and count. Where a cluster sits on a campus both sites cover, we use the same source and the same figures. A status can differ when a campus runs one cluster and builds another: Mistral’s Bruyères-le-Châtel campus is operational there because an earlier cluster runs on it, while the new 13,800-GPU GB300 cluster is still announced here.
Corrections
Owners and readers can send corrections to hello@gpuclusterlist.com with a public source. We update the row and its verified date. Featured placement is paid and labelled; it never changes a row’s data or its position in the sorted table.
Field definitions
21 fields- Owner / operator
- Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
- GPU maker
- NVIDIA, AMD or Intel, taken from the GPU model.
- GPU model
- Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
- GPUs installed
- Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
- GPUs planned
- Announced, contracted or target GPU count. Not evidence that the GPUs are installed.
- GPU count notes
- What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
- Location
- City, region and country where the cluster sits. Empty when the operator does not name the site.
- Country
- Country of the cluster, taken from the location.
- Live power MW
- Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
- Planned power MW
- Planned or contracted power at full build, in megawatts.
- Power notes
- Basis and date of the power figures, and who published them.
- Status
- operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
- Operational since
- Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
- Status notes
- The source’s wording on status, with the date.
- Figures as of
- Date of the source disclosure behind the figures, where the source dates it.
- Partners
- Customer, facility owner, builder or procurement body, as named by the source.
- Interconnect
- Cluster network fabric.
- Compute nodes nodes
- Compute nodes in the system or partition.
- Cooling
- Cooling method where published.
- HPL performance PFLOP/s
- Linpack (HPL) result, as published.
- Workload
- Main workload as stated by the source.