JUPITER Booster

EuroHPC and Jülich provide JUPITER for scientific simulation, data analysis and large-scale AI.

JUPITER Booster is an operational GPU cluster run by Jülich Supercomputing Centre (EuroHPC JU) in Jülich, Germany. It runs NVIDIA GH200; no installed GPU count is published.

Supercomputer

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Jülich Supercomputing Centre (EuroHPC JU) 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA GH200 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
Around 24,000 GH200 superchips on roughly 6,000 Booster nodes (Jülich); no exact total published. 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Jülich, Germany 1
Country Country of the cluster, taken from the location.
Germany 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
Not published
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
operational 1
Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
2025 1
Status notes The source’s wording on status, with the date.
Unveiled at Forschungszentrum Jülich in 2025 and ranked fourth on the June 2025 TOP500 list. 1
Partners Customer, facility owner, builder or procurement body, as named by the source.
Procured by: EuroHPC JU 1
Interconnect Cluster network fabric.
NVIDIA Quantum-2 InfiniBand 1

Sources

  1. fz-juelich.de accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.