Meta uses Prometheus to train its Muse foundation models. The first phase is complete.

Meta Prometheus is a partly operational GPU cluster run by Meta in New Albany, Ohio, United States. 1,000,000 NVIDIA GB200 GPUs are planned; no installed count is published. Live power: 471 MW (Epoch AI estimate), 1,000 MW planned.

Big tech

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Meta 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA GB200 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPUs planned Announced, contracted or target GPU count. Not evidence that the GPUs are installed.
1,000,000 1
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
Hundreds of thousands currently; approximately one million is a future target. 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
New Albany, Ohio, United States 1
Country Country of the cluster, taken from the location.
United States 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
471 2
Planned power MW Planned or contracted power at full build, in megawatts.
1,000 3
Power notes Basis and date of the power figures, and who published them.
Meta announced about 1 GW for 2026. Epoch AI estimates 471 MW IT as of 31 Aug 2026. 1
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
partly operational 1
Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
2025-10 1
Status notes The source’s wording on status, with the date.
First phase complete and in use for Muse model training; expansion toward about 1 million GPUs continues. 1
Figures as of Date of the source disclosure behind the figures, where the source dates it.
2026-10-19 1

Sources

  1. engineering.fb.com accessed 2026-11-11
  2. Epoch AI estimate: AI data centers dataset accessed 2026-11-11
  3. Meta Engineering: infrastructure evolution and the advent of AI accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.