Deutsche Telekom Industrial AI Cloud (Munich)

Deutsche Telekom and NVIDIA’s sovereign AI factory in Munich: up to 10,000 Blackwell GPUs in DGX B200 and RTX PRO servers, sold to German industry.

Deutsche Telekom Industrial AI Cloud (Munich) is an operational GPU cluster run by Deutsche Telekom in Tucherpark, Munich, Bavaria, Germany. 10,000 NVIDIA B200 (DGX B200) and RTX PRO Blackwell GPUs are planned; no installed count is published.

GPU cloud

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Deutsche Telekom 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA B200 (DGX B200) and RTX PRO Blackwell 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPUs planned Announced, contracted or target GPU count. Not evidence that the GPUs are installed.
10,000 1
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
Telekom: “up to 10,000” Blackwell GPUs in more than 1,000 DGX B200 systems plus RTX PRO servers; no exact installed total. 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Tucherpark, Munich, Bavaria, Germany 2
Country Country of the cluster, taken from the location.
Germany 2
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
Not published
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
operational 2
Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
2026 1
Status notes The source’s wording on status, with the date.
Telekom (Nov 2026): the first expansion phase runs at full capacity and capacity is being doubled. 2
Partners Customer, facility owner, builder or procurement body, as named by the source.
NVIDIA 1

Sources

  1. Deutsche Telekom press release (Nov 2025) accessed 2026-11-11
  2. Deutsche Telekom: Industrial AI Cloud accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.