Microsoft Fairwater Atlanta
Microsoft operates Atlanta Fairwater for AI workloads and connects it to other Fairwater sites through a dedicated network.
Microsoft Fairwater Atlanta is an operational GPU cluster run by Microsoft in Atlanta area, Georgia, United States. It runs NVIDIA GB200 NVL72; no installed GPU count is published. Live power: 636 MW (Epoch AI estimate), 859 MW planned (Epoch AI estimate).
Facts
Source per value- Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
- Microsoft 1
- GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
- NVIDIA 1
- GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
- NVIDIA GB200 NVL72 1
- GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
- Not published
- GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
- No exact installed GPU count disclosed; scaling claims apply to system design. 1
- Location City, region and country where the cluster sits. Empty when the operator does not name the site.
- Atlanta area, Georgia, United States 1
- Country Country of the cluster, taken from the location.
- United States 1
- Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
- 636 2
- Planned power MW Planned or contracted power at full build, in megawatts.
- 859 2
- Power notes Basis and date of the power figures, and who published them.
- Epoch AI estimates 636 MW IT with buildings 1 to 4 operational as of 14 Jun 2026. Microsoft gives no MW figure. 1
- Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
- operational 1
- Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
- 2025-10 1
- Status notes The source’s wording on status, with the date.
- Operating since October 2025 1
- Figures as of Date of the source disclosure behind the figures, where the source dates it.
- 2025-11-12 1
- Cooling Cooling method where published.
- Advanced liquid cooling 1
Sources
- news.microsoft.com accessed 2026-11-11
- Epoch AI estimate: AI data centers dataset accessed 2026-11-11