Mistral AI Bruyères-le-Châtel cluster
Mistral financed this French GPU cluster for its own models and customer training and inference.
Mistral AI Bruyères-le-Châtel cluster is an announced GPU cluster run by Mistral AI in Bruyères-le-Châtel (Eclairion campus), Île-de-France, France. 13,800 NVIDIA GB300 GPUs are planned; no installed count is published. Planned power: 44 MW.
Facts
Source per value- Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
- Mistral AI 1
- GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
- NVIDIA 1
- GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
- NVIDIA GB300 1
- GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
- Not published
- GPUs planned Announced, contracted or target GPU count. Not evidence that the GPUs are installed.
- 13,800 1
- Location City, region and country where the cluster sits. Empty when the operator does not name the site.
- Bruyères-le-Châtel (Eclairion campus), Île-de-France, France 1
- Country Country of the cluster, taken from the location.
- France 1
- Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
- Not published
- Planned power MW Planned or contracted power at full build, in megawatts.
- 44 2
- Power notes Basis and date of the power figures, and who published them.
- 44 MW per press reports of the March 2026 financing. 1
- Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
- announced 1
- Status notes The source’s wording on status, with the date.
- Financed March 2026 with a Q2 2026 go-live target; no go-live confirmed as of 11 Nov 2026. AI Data Center List marks the Eclairion campus operational because an earlier Fluidstack-built Mistral cluster runs there; this row tracks the new 13,800-GPU GB300 cluster. 1
- Figures as of Date of the source disclosure behind the figures, where the source dates it.
- 2026-03-30 1
Sources
- linklaters.com accessed 2026-11-11
- The Next Web: Mistral AI $830M debt for a Paris data centre accessed 2026-11-11