Nebius Kansas City GPU cluster
Nebius announced this US cluster for AI cloud customers, beginning with Hopper GPUs and a possible larger buildout.
Nebius Kansas City GPU cluster is an announced GPU cluster run by Nebius in Kansas City, Missouri, United States. It runs NVIDIA Hopper; no installed GPU count is published. Planned power: 40 MW.
Facts
Source per value- Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
- Nebius 1
- GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
- NVIDIA 1
- GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
- NVIDIA Hopper 1
- GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
- Not published
- GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
- Thousands in initial phase; up to about 35,000 is expansion potential. 1
- Location City, region and country where the cluster sits. Empty when the operator does not name the site.
- Kansas City, Missouri, United States 1
- Country Country of the cluster, taken from the location.
- United States 1
- Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
- Not published
- Planned power MW Planned or contracted power at full build, in megawatts.
- 40 1
- Power notes Basis and date of the power figures, and who published them.
- Initial 5 MW, 40 MW at full build (Nebius, November 2024). 1
- Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
- announced 1
- Status notes The source’s wording on status, with the date.
- November 2024 announcement targeted a Q1 2025 go-live; go-live is not confirmed in the source. 1
Sources
- nebius.com accessed 2026-11-11