Nebius Kansas City GPU cluster

Nebius announced this US cluster for AI cloud customers, beginning with Hopper GPUs and a possible larger buildout.

Nebius Kansas City GPU cluster is an announced GPU cluster run by Nebius in Kansas City, Missouri, United States. It runs NVIDIA Hopper; no installed GPU count is published. Planned power: 40 MW.

GPU cloud

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Nebius 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA Hopper 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
Thousands in initial phase; up to about 35,000 is expansion potential. 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Kansas City, Missouri, United States 1
Country Country of the cluster, taken from the location.
United States 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
Not published
Planned power MW Planned or contracted power at full build, in megawatts.
40 1
Power notes Basis and date of the power figures, and who published them.
Initial 5 MW, 40 MW at full build (Nebius, November 2024). 1
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
announced 1
Status notes The source’s wording on status, with the date.
November 2024 announcement targeted a Q1 2025 go-live; go-live is not confirmed in the source. 1

Sources

  1. nebius.com accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.