Nebius Vineland GPU infrastructure
Nebius is the GPU-infrastructure tenant at the DataOne Vineland AI factory, serving advanced AI workloads.
Nebius Vineland GPU infrastructure is a partly operational GPU cluster run by Nebius (tenant at DataOne) in Vineland, New Jersey, United States. Live power: 50 MW (Epoch AI estimate), 300 MW planned.
Facts
Source per value- Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
- Nebius (tenant at DataOne) 1
- GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
- Not published
- Location City, region and country where the cluster sits. Empty when the operator does not name the site.
- Vineland, New Jersey, United States 1
- Country Country of the cluster, taken from the location.
- United States 1
- Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
- 50 3
- Planned power MW Planned or contracted power at full build, in megawatts.
- 300 2
- Power notes Basis and date of the power figures, and who published them.
- Up to 300 MW (Nebius). Epoch AI estimates the first 50 MW IT live as of 12 Jul 2026. 1
- Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
- partly operational 3
- Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
- 2026 3
- Status notes The source’s wording on status, with the date.
- The first 50 MW phase is live (Epoch AI estimate); up to 300 MW planned. 1
- Partners Customer, facility owner, builder or procurement body, as named by the source.
- Facility owner: DataOne 1
- Cooling Cooling method where published.
- Closed-loop cooling 1
Sources
- nebius.com accessed 2026-11-11
- Nebius: up to 300 MW in New Jersey accessed 2026-11-11
- Epoch AI estimate: AI data centers dataset accessed 2026-11-11