Nscale Sines AI campus deployment

Nscale supplies Microsoft with GPU infrastructure at the SINES Data Campus, with a further Rubin deployment announced for late 2027.

Nscale Sines AI campus deployment is an operational GPU cluster run by Nscale in Sines, Portugal. It runs NVIDIA Blackwell Ultra; no installed GPU count is published. Live power: 33 MW (Epoch AI estimate).

GPU cloud

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Nscale 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA Blackwell Ultra 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
Over 12,600 Blackwell Ultra GPUs in the referenced deployment. 66,000+ Rubin GPUs, starting late 2027. 1
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Sines, Portugal 1
Country Country of the cluster, taken from the location.
Portugal 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
33 2
Power notes Basis and date of the power figures, and who published them.
Epoch AI estimates 33 MW IT live as of 16 Aug 2026. A 200 MW second building is planned for the Rubin expansion. 1
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
operational 1
Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
2026 1
Status notes The source’s wording on status, with the date.
The first-building Blackwell Ultra deployment is live; the Rubin expansion starts in late 2027. 1
Figures as of Date of the source disclosure behind the figures, where the source dates it.
2026-05-05 1

Sources

  1. nscale.com accessed 2026-11-11
  2. Epoch AI estimate: AI data centers dataset accessed 2026-11-11
  3. Start Campus: first GB300 chips with Nscale for Microsoft accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.