Stargate Abilene (Crusoe / Oracle)

Crusoe built Stargate’s Abilene campus, where Oracle runs AI training and inference infrastructure for OpenAI.

Stargate Abilene (Crusoe / Oracle) is a partly operational GPU cluster run by Oracle (built by Crusoe, for OpenAI) in Abilene, Texas, United States. It runs NVIDIA GB200; no installed GPU count is published. Live power: 618 MW, 1,200 MW planned.

GPU cloud

Verified

Operator page Compare with others Request GPU capacity

Facts

Source per value
Owner / operator Organization that owns or operates the GPUs. Hosting and facility roles are listed under Partners.
Oracle (built by Crusoe, for OpenAI) 1
GPU maker NVIDIA, AMD or Intel, taken from the GPU model.
NVIDIA 1
GPU model Accelerator model or family as disclosed. A GH200 is one GPU on a superchip; an MI300A is an APU that contains a GPU.
NVIDIA GB200 1
GPUs installed Physical GPUs in the cluster, from the operator or a deterministic sum of disclosed quantities (nodes × GPUs per node). Planned counts, H100-equivalents and unaudited press totals are never counted here.
Not published
GPU count notes What the count covers (one partition, one site, a design limit), qualifiers and competing figures.
No installed campus GPU total asserted; per-building design limit is not an installed count. 2
Location City, region and country where the cluster sits. Empty when the operator does not name the site.
Abilene, Texas, United States 1
Country Country of the cluster, taken from the location.
United States 1
Live power MW Power in service, in megawatts of IT load where the source says so. Company figures are marked in the notes; Epoch AI satellite estimates are labelled as estimates.
618 3
Planned power MW Planned or contracted power at full build, in megawatts.
1,200 2
Power notes Basis and date of the power figures, and who published them.
Oracle (10 Sep 2026): 6 of 8 buildings delivered, 618 MW. About 1.2 GW planned for the campus. 2
Status operational = running and named as such by the operator or a primary source; partly operational = a phase is live and more is coming; under construction = building underway; announced = disclosed or contracted with no confirmed go-live.
partly operational 1
Operational since Month or year the source gives for the cluster going live (first phase for partly operational clusters). Empty when no date is published.
2025-09 1
Status notes The source’s wording on status, with the date.
First buildings live from September 2025; Oracle reported 6 of 8 buildings delivered on 10 Sep 2026. 1
Figures as of Date of the source disclosure behind the figures, where the source dates it.
2025-09-30 1
Partners Customer, facility owner, builder or procurement body, as named by the source.
Builder: Crusoe; Customer: OpenAI 1

Sources

  1. crusoe.ai accessed 2026-11-11
  2. crusoe.ai accessed 2026-11-11
  3. Oracle Q1 FY27 earnings call transcript accessed 2026-11-11

Related clusters

All 87 clusters

Lists

Need GPU capacity at this scale? Request quotes from GPU cloud providers

Tell us what you need once. We send it to matching GPU cloud providers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@gpuclusterlist.com.